Arrived
at 6 AM

Heading
into the Panama Canal

It
costs around $80,000 to go through - cash

Trains
hook up wires to steady the ship

Pulling
into the first lock

Pulling
into second lock - look at water level

Water
fills the lock

Doors
open for next lock

Lock
chambers are 33.5 meters wide and 305 meters long

Administration
building

Last
lock
The
locks raise the ship by 85 feet to get to Gatun Lake

$80,000
or go around South America

Rain
forest provides all the water for the canal

Lush
vegetation

Pulling
into Gatun Lake

Most
of the money raised by the canal is spent on maintenance

Gatun
Lake is large enough to hold many big ships
In
1979 the Panama Commission took over the operation of the canal

Kim
and Mike in front of the Panama Canal
For
more information on the Panama Canal check out
www.PanamaCanal.com
and click on Operation
![]() |
|
![]() |
||||||||||||||||||||||
| |
![]() |
|
![]() |
|
||||||||||||||||||||
![]() |
![]() |
![]() |
||||||||||||||||||||||
| |
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
||||||||||||||
| |
|
|
|
|
||||||||||||||||||||
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E-mail
us at
MPrior@PryCom.com
See
Mike & Kim's other cruises:
www.PryCom.com/Cruises
Stingrays Dolphins Turtles Subs
Helmet Diving Kayaking
Make
Your Next Message a Priority!
Web Design
Print Advertising Graphics
©
Priority Communication, 2005
Unique Visitor Number