Panama Canal

Arrived at 6 AM

Heading into the Panama Canal

It costs around $80,000 to go through - cash

Trains hook up wires to steady the ship

Pulling into the first lock

Pulling into second lock - look at water level

Water fills the lock

Doors open for next lock

Lock chambers are 33.5 meters wide and 305 meters long

Administration building

Last lock

The locks raise the ship by 85 feet to get to Gatun Lake

$80,000 or go around South America

Rain forest provides all the water for the canal

Lush vegetation

Pulling into Gatun Lake

Most of the money raised by the canal is spent on maintenance

Gatun Lake is large enough to hold many big ships

In 1979 the Panama Commission took over the operation of the canal

Kim and Mike in front of the Panama Canal

For more information on the Panama Canal check out
www.PanamaCanal.com
and click on Operation

  Aruba Photos<empty> Panama Photos  
Costa Rica Photos Grand Cayman Photos
Panama Canal Photos
Ship Photos Pool Photos Dining Photos Food Photos Casino Photos
  Room Photos Read the Captain's Log Go to Movie  

E-mail us at MPrior@PryCom.com

See Mike & Kim's other cruises:
www.PryCom.com/Cruises

Stingrays • Dolphins • Turtles • Subs
Helmet Diving • Kayaking


Make Your Next Message a Priority!
www.PryCom.com
Web Design • Print Advertising • Graphics

© Priority Communication, 2005


Unique Visitor Number

Free Web Counter